Skip to content
The studio 2.5 BIM Open Toolkit is open source.Get the toolkit →
Work

Your people and agents, doing the work of a project, a program, or your whole portfolio.

RFIs, reviews, checks and approvals run here. Agents do the preparation. Your people make the calls.

Work

Say what work needs doing.

Type it in plain words, or choose an agent. You see exactly what will be sent before anything runs.

Carbon by storey for the client review
Carbon check
Board

See what is waiting on you.

Every piece of work in a project, a program or a portfolio sits on one board. You see what an agent is preparing, what is with someone else, and what needs your signature.

studio 2.5
The Duplex
In this project
Work
Board
Agents
Ledger
People
studio 2.5
Notebook
Studio
Your turn1
Quantity takeoff
Quantities by type for the design development cost estimate
Ready for you to sign
In progress2
Carbon check
Carbon by storey for the client review
The agent is at work
IDS check
Does the model meet the client's information requirements?
The agent is at work
With others1
RFI
RFI 001: Do the 8 beams at Level 2 match the structural model?
Waiting on Riley Chen, Structural lead
Done1
Carbon check
Carbon by storey for the design development issue
Approved by Alex Morgan, Sustainability lead
A personAn agentSample project: the Duplex, a house of two units.
Agents

An agent for every piece of work in the life of a building.

Each one prepares a single piece of work, and a named person signs it. A few run today. The rest are being built with the people who do that work.

Runs todayBeing built
Design73 pieces of work in nine families, from pursuit to handover
Pursuit and setup7
Go or no go, Proposal and fee, Contract and scope review, Project execution plan, BIM execution plan and information requirements, Consultant onboarding, Responsibility matrix
Brief and predesign7
Client brief and program, Site and context analysis, Zoning and planning review, Code analysis, Authority preconsultation, Feasibility and test fits, Basis of design
Design management9
Options evaluation, Design decision log, Design reviews, Consultant coordination, Model federation and clash review, Design change control, Area and program tracking, Room data sheets, Client stage review and sign off
Analysis and performance10
Code compliance check, Accessibility check, Fire and life safety review, Energy model coordination, Embodied carbon check, Daylight and comfort review, Engineering calculation checking, Quantity takeoff and cost estimate, Value engineering, Sustainability certification tracking
Documentation and quality9
Specifications, Model checks against standards, Drawing and sheet QA, Door, hardware and finish schedules, Interdisciplinary check, Drawing register and issue packages, Transmittals, Permit submission, Authority comment responses
Tender5
Tender package, Bidder questions, Addenda, Bid evaluation, Alternates and substitutions before award
Construction administration11
RFIs, Submittals and shop drawings, Supplemental instructions, Contemplated changes and change orders, Change directives, Field review reports, Deficiency tracking, Payment certification, Substitution requests, Testing and inspection review, Site meeting minutes
Closeout and handover7
Substantial performance review, Final deficiencies, O&M manual review, Record model, Asset data handover, Warranty review, Post occupancy evaluation
Practice management8
Project schedule, Fee and hours tracking, Resourcing, Risk register, Meetings and action items, Correspondence, Additional services and scope change, Lessons learned
Construction67 pieces of work in nine families, from the estimate to closeout
Estimating and bidding8
Bid or no bid, Quantity takeoff, Conceptual estimate, Detailed estimate, Subcontractor scope sheets, Bid levelling, Bid clarifications, Bid submission
Preconstruction planning8
Constructability review, Site logistics plan, Master schedule, Phasing and sequencing, Value engineering, Long lead item review, Permit tracking, Risk register
Procurement and buyout7
Trade package scoping, Subcontract buyout, Purchase orders, Subcontract compliance, Insurance and bonding check, Material tracking, Delivery scheduling
RFIs and submittals8
RFI drafting, RFI collaboration and resolution, Submittal register, Submittal check, Shop drawing review, Mock up and sample tracking, BCF issue triage, Clash review
Change management7
Change event log, Change pricing, Change order request, Change directive tracking, Back charges, Claims and notices, Contingency tracking
Schedule and progress7
Look ahead schedule, Progress measurement, Schedule update, Delay analysis, Daily reports, Site log, Progress from the model
Quality, inspection and safety8
Inspection and test plan, Inspection checklists, Nonconformance reports, Deficiency tracking, Site safety plan, Hazard assessment, Incident reporting, Toolbox talk records
Cost control and payment7
Budget and cost code setup, Cost to complete forecast, Progress billing, Subcontractor payment review, Holdback tracking, Cash flow forecast, Cost report
Closeout and handover7
Commissioning tracking, Final deficiencies, O&M manual assembly, Record model, Asset data handover, Warranty register, Final account
Ownership51 pieces of work in nine families, from capital planning to renewal
Capital planning7
Needs assessment, Business case, Options analysis, Capital plan priorities, Funding and approvals, Project brief, Delivery model selection
Owner requirements6
Project requirements, Design standards check, Information requirements, Design review comments, Sustainability targets, Accessibility requirements
Program delivery7
Program schedule, Program cost report, Risk and contingency, Change approval, Consultant and contractor performance, Monthly program report, Stage gate review
Handover and asset data6
Handover completeness, Asset register, O&M manual review, Warranty register, Commissioning records, Training records
Operations and maintenance6
Work order triage, Preventive maintenance plan, Service contract review, Spare parts and inventory, Space and occupancy, Service request answers
Condition and renewal5
Condition assessment, Deferred maintenance backlog, Renewal forecast, Repair or replace analysis, Capital renewal plan
Energy and carbon5
Energy use review, Operational carbon report, Embodied carbon check, Retrofit options, Utility bill check
Compliance and audit5
Regulatory inspections, Life safety systems check, Audit response, Board and regulator questions, Policy compliance check
Total cost of ownership4
Whole life cost model, Lifecycle cost comparison, Replacement reserve forecast, Portfolio benchmark
Ledger

Every result is kept with a name on it.

What was asked, why it was needed, who signed and what they decided. You pay for what is approved here.

Carbon by storey for the design development issueSample
WorkflowEmbodied carbon check
Why it was neededTo compare against the target before the client review.
Signed byAlex Morgan, Sustainability lead
WhenNov 10, 2026, 11:00 a.m.
Reason for approvalThe material matching is right for this stage. The factors are placeholders, to be replaced at construction documents.
Result57.53 t CO2e in 91 elements
Roof2.64 t
Level 219.93 t
Level 125.27 t
T/FDN9.69 t
Each figure is tied to its elements in the model. Open the entry to see them in 3D.
People

A named person signs every result.

Each project, program and portfolio lists the people who can sign and what they sign for. An agent never signs.

The Duplex, a house of two unitsSample
PursuitPredesignSchematic designDesign developmentConstruction documentsBiddingConstructionPost construction
SLSam LeeProject manager
JPJordan PatelArchitect of record
AMAlex MorganSustainability lead
RCRiley ChenStructural lead
MDMorgan DiazCost consultant
8Agents on this projectPrepare the work
Studio

Build your own workflows.

We build each workflow with the people who do that work. In Studio your firm builds its own. Place a block, connect it to the next one, and run it.

studio 2.5
The Duplex
In this project
Work
Board
Agents
Ledger
People
studio 2.5
Notebook
Studio
Wall condition against standardExampleRun
Load elements01
ModelArchitecture
TypeWalls
178 elements
Check condition02
Standard3.0 or better
On a gapReport it
14 below
Explain03
ReadsRepair history
WritesA reason each
14 reasons
Write result04
ToThe model
KeptIn your Ledger
14 flagged
ElementLocationConditionVerdict
Exterior wallLevel 12.1Below
Exterior wallLevel 22.4Below
Interior partitionLevel 12.8Below
Exterior wallRoof2.9Below
Model
Load model, Filter by level, Filter by type
Data
Cost, Schedule, Condition
Compute
Calculate, Aggregate, Join
Agents
Explain, Draft, Check
Output
Table, BCF, Ledger entry
A block that is an agent
It runs again.
A workflow built for one project runs on the next one.
It becomes an agent.
Publish it, and anyone on the project can start it from Work.
It is kept with the evidence.
What it read and what it produced go into your Ledger.

Start a piece of work.

Start Working