Ask the question you would have to send someone away for two weeks to answer.
Ask it the way you would ask a person who had read your whole organization. Answered with the evidence attached.
Request a Demo
Every answer comes from something you already have.
Every query reaches your model, the systems you already run, the obligations you are held to, and the judgement your people have built up over thirty years.
Your model
Every element in it, with its geometry and parameters, and an identity that survives the file and the handover.
Your systems
Cost, schedule, contracts, documents, field records. Whatever you already run, joined to the elements they are actually about.
Your obligations
Code, permits, standards, contract terms, insurance and warranty, versioned so you can see which one governed and when.
Your people
How your organization has decided things before. The precedent and the reasoning, kept with the signature so the next question can use it.
210 tonnes CO2e committed, forecast to 2,335 tonnes over the whole life at completion. That is roughly 47% of the program's 4,990 tonne LEED Gold budget. The program overall is forecast at 5,425 tonnes, 435 over budget, and heating is the main driver: the building runs on temporary heating until the heat pump plant is specified.
get_asset_carbon_commitment·get_program_carbon_trajectoryNot fully. It is online with 538 of 560 data points live and 99.4% uptime over thirty days. But one warning alarm has been open 125 hours pending a duct reroute decision, the air handling unit and circulation pump control groups are still commissioning, and CMMS and COBie integration are both outstanding.
get_ot_system_status·get_ot_commissioning_status·get_cybersecurity_assessment_status·get_asset_operational_readinessNo such approved change exists. There are three active change events across the program and none concerns a roof assembly. The nearest is DHUB-CE-005, a door leaf and glass facade door remediation raised 14 November 2025, still pending negotiation at $90,000 claimed against $75,000 assessed. If you have a specific change ID, I can pull the exact record.
get_change_exposure·get_open_decisions·get_asset_documents·+4 moreFour of four. Architecture fit-out is furthest behind at SPI 0.88 and 24 days, carrying a $640,000 cost variance and $50,000 per week in liquidated damages exposure. Heating follows at SPI 0.90 with a $350,000 variance and an overdue heat pump decision holding $650,000 of procurement. The two are linked: the plant room enclosure and ceiling sequence in architecture are blocked by that heating decision.
get_program_structure·get_delivery_performance·get_contract_performance·+4 moreEvery answer shows its work.
The evidence
Which elements and which records. Every number traceable to its source.
The marker
Computed, attested, or advisory. You always know which kind of answer you are looking at.
The disagreement
If it is wrong, you can see where it came from and say so. The correction goes into the record.

The next question starts where the last one finished.
Every answer you accept becomes part of the record, so the next person asking a similar question starts from what you already worked out rather than from nothing.
Can we substitute gas boilers for the heat pump plant?
Not yet, and the decision is overdue. RFI-001 is 27 days past its response date, and the energy model favours the ground-source heat pump. CE-001 carries the heat pump plant change rather than a boiler substitution, raised 25 October at $650,000 claimed against $580,000 assessed, with a 21-day schedule impact. The reasoning is on the record (DEC-HEAT-014) and the approval sits at program director level.
get_change_exposure·get_materials_specification_status·get_asset_documents·+2 moreTwo of the records behind the November answer did not exist in March.